Redshift Project Depot

FRC 2018 (Power Up) => Robot Hardware => Topic started by: Pablo C on January 17, 2018, 07:14:57 AM

Title: Chassis Progress Report
Post by: Pablo C on January 17, 2018, 07:14:57 AM
We continued making gusset plates.

To do next: Finish drilling holes in gusset plates and 1x1 Alluminum Ls. Put in 1/4-20s and check design.

Later: replicate design on the other side of the robot. Assemble frame.
Title: Re: Chassis Progress Report
Post by: Pablo C on January 17, 2018, 01:51:40 PM
Per Ed's email, I am replying with the entire chassis to-do list. I will keep this list updated. Anyone working on chassis, please post your progress for the day here so everyone's on the same page.

Chassis Fabrication:
     Side Gusset Plates - 8 Left
          Cut
          Drill
          Install
     Swerve units - 1 Left
          Fix wheel issue
          Install
     Anti-Twist Bracing
          Experiment/Design
          Cut, Drill

Once this is done, chassis is pretty much complete. After this we need to think about how all the other subsystems will attach.
Things to Attatch:

We also at some point need to report either the weight or the ammount of aluminium to Anthony.