FRC 2018 (Power Up) => Program Management => Topic started by: Louis L on March 26, 2018, 12:58:45 PM

Title: Post-WPI discussion summary
Post by: Louis L on March 26, 2018, 12:58:45 PM
This posting is obviously late but it's important to document everything.

I took a picture of the workroom whiteboard and transcribed it here. The flow of the discussion is reflected in the grouping of the items below.

First we discussed what went right and wrong. The focus is of course on what went wrong since that's what we wanted to fix between WPI and RIDE.
Now that we have a list of problems, we tried to summarize the root cause that lead to these problems from a design point of view.Finally we need to identify what led to a poor design so we don't do it again in the future.