• Welcome to Redshift Project Depot.
 

Arm + Claw

Started by Isha H, January 17, 2018, 03:28:30 PM

Previous topic - Next topic

Isha H

Arm Tasks
  • Detailed design w/ math worked out - arm length, tower height, motor + sprocket placements, bracing placements
  • Fabrication + Assembly


      • Towers - 1x2 alum (1/8th in)tubing

        • cut to length (38 in)
        • drill 3/4 in holes for 1/2 in axle (arms rotate upon)
        • attach bushings

      • Arms - 1x2 1/8th in. alum tubing

        • cut to length (39 in)
        • drill 3/4 in. holes for 1/2 axle
        • attach bushings
        • attach drawer slides w 12 in. throw

      • Axle

        • attach sprockets + chain in center (lift arm)

          • 2 in sprocket (1/2 in. hex shaft)
          • 6 in. sprocket
          • #35 chain
        • attach arms + tower
        • attach necessary spacers

      • Bracings

        • cut + mount center vertical bracing up entire height of towers
        • cut + mount horizontal plate for motor (halfway up tower)

          • motor - mini cim w/ 64:1 sport gear box
        • determine triangle supports for side of towers

Claw Tasks
  • finalize design + measurements
[/list]

Isha H

#1
    Progress Report
    • cut towers to length
    • cut arms to length
    Action Items
    • attach bushings to arms + towers (waiting for bushings)
    • cut plate for motor mount
    • work on finalizing the design for claw

    Progress depends on getting the specific parts we need - sprockets, chain, drawer slides, etc. Sarah has been working on the claw design, but won't be able to come in until Friday - if no progress can be done for the arm/towers (bc we haven't gotten certain parts), will be working on finalizing the claw design + or helping build chassis.
    [/list]