Put stuff here that you think needs to be done. Assign a priority
When an item is done, just mark it with an 'X'
Priority 1 (immediate attention)
- (done) Take picture of high goal with retro-reflective tape for LabVIEW vision assistant
- (done) Program/image both router
- (done) Image new RoboRio
- Update all software laptops with latest software per Brad's instructions.
Priority 2 (do it soon)
- (done 1/12/16) Clean Dev1 laptop that's overheating
- (done) Check log of other 6 laptops to see what their diag log looks like. Are there similar overheating issues?
- Check the firmware revision on the Talon SRX. FRC Firmware Revision 2.0, dated 1/10/16 is out so our older SRX controllers may need to be updated. We should also check to see if any of Talons have non-FRC firmware.
Priority 3 (do when time allows)
Priority 4 (not important, just nice to have done)